Vault Door. Carver Lane-sheet 5 of 5. Step the last. Big pieces, easy to handle and it drove me crazy. ‘The Door’ is a construct of 5 pieces. The ‘wall’ and a stack of 4 pieces behind it. I have to find a better glue! I needed the longevity of the PVA to enable the slow movement to align the pieces. But then I needed the quick stick of the Super Glue to hold them in place. The PVA takes too damned long. I would get the first two pieces aligned and glued, place the assembly down to dry and the pieces would slide out of alignment. Arrggghhh!@!@!
The two hinge pieces are similar but different. Not a problem, just don’t waste time trying to force them in wrong place. When the sub assembly is complete the top and side slabs align with the back of the door insert stack, giving you 4 points of contact with the house wall. Bonus. Thank you designer. Make sure the whole assembly is completely dry before you stick it to the wall.

One step left. The roof tiles. It has been many, many, many years since I last laid floor covering in the toilet. I do remember I hated cutting it to shape around the toilet base. I am not looking forward to fitting the tiles around the attic windows. Coffee time!